Lahontan Gold Reports High-Grade Oxide Gold Intercept at Santa Fe Project

Lahontan Gold Corp. announced high-grade oxide gold intercepts at its Santa Fe Mine project, advancing the project toward a targeted 2027 mine construction start and underscoring its potential for near-term production.

DC Metrowire Staff
Business
Lahontan Gold Reports High-Grade Oxide Gold Intercept at Santa Fe Project

Lahontan Gold Corp. (TSXV: LG) (OTCQB: LGCXF) has reported additional high-grade oxide gold intercepts from its 2026 drilling program at the Santa Fe Mine project in Nevada. The results, highlighted by a geotechnical diamond drill hole at the Calvada deposit, include 30.8 meters grading 0.93 grams per tonne gold equivalent (Au Eq), with a higher-grade interval of 10.7 meters grading 2.18 g/t Au Eq. The company stated this intercept ranks among the highest-grade results drilled to date within the Central Calvada deposit and supports confidence in advancing the project toward a targeted mine construction start in 2027.

Additional reverse-circulation drilling at the southern end of the Slab open pit encountered near-surface oxide mineralization, including 15.2 meters grading 0.40 g/t Au Eq and 9.1 meters grading 0.22 g/t Au Eq, helping define mineralization near the Calvada Fault. Drilling continues across the Santa Fe project, with further results expected from its RC program and Sonic drilling campaign evaluating historic stockpiles and heap leach pads. These efforts are part of broader work to update the project's mineral resource estimate, complete a preliminary economic assessment, and advance permitting activities.

The Santa Fe Mine project, which produced 359,202 ounces of gold and 702,067 ounces of silver between 1988 and 1995 from open pit mines using heap-leach processing, hosts a NI 43-101 compliant Indicated Mineral Resource of 1,539,000 oz Au Eq (48,393,000 tonnes grading 0.92 g/t Au and 7.18 g/t Ag) and an Inferred Mineral Resource of 411,000 oz Au Eq (16,760,000 tonnes grading 0.74 g/t Au and 3.25 g/t Ag), all pit constrained. The company plans to continue advancing the project toward production, update the Santa Fe Preliminary Economic Assessment, and drill test its satellite West Santa Fe project during 2025.

The technical content of this news release has been reviewed and approved by Michael Lindholm, CPG, Independent Consulting Geologist to Lahontan Gold Corp., who is a Qualified Person as defined in National Instrument 43-101. For more information, visit the company's website at www.lahontangoldcorp.com. The full press release is available at https://ibn.fm/eIjZy.

Blockchain Registration

QR Code for Blockchain Registration